DETAILS
A bespoke basement MDF unit which was defaced during a flood, removed replaced and restored to a more strategic design enabling better use of space for the client and storage elements throughout the area.
This was removed and reinstated by an Arrow joiner who carefully designed the unit with the client prior to 2 week programme of installation.