Arrow were tasked with replacing the old, tired ramp/bridge to the Treehouse. We began by removing the existing bridge and existing structure.
We then set about manufacturing and installing a new steel framing for the bridge, which included new footings for the legs and feet. Then constructed a new walkway with a handrail and banister. Our esteemed client loved the look of the new installation.
Check out the transformation below!